Structural

The Tiny Temple Built October 2019- July 2020
quintespiral framing/shelf brackets.
Horse stall door modified to open with locking mechanism
Arches built during a joint project.
Tile work in the tiny temple
Trailer modified to be 2 feet shorter rewelded ramps, lights, and hold downs.